Callum (Rex's new manager): Here's your laptop. And here's a map of our systems: everything we use, and how it all connects.
Who has clearly done this before.
Where am I?
Nobody drew Rex a map, so he spent his first week lost. This lesson draws it: the hidden town, its districts and its buildings.
Same Monday, with a map
Callum (Rex's new manager): Here's your laptop. And here's a map of our systems: everything we use, and how it all connects.
Who has clearly done this before.
Rex needs a drawing. The map says which system it's in. Five minutes, job done, kettle on.
Rex: Right, here's the map. Let me show you where everything lives.
A week in, showing the next new starter around like he owns the place.
Could you draw a map of your organisation's systems on one page? Try it now: what you use, how it connects, and who looks after each one.
Rex's diary. Week 2. Found six different systems. Made my first calc today. It's on my desktop for now. I'll tidy it up later.
Every organisation has a hidden town: the digital world where its work really happens. Each part of the business is a district, and each district has its own buildings, the systems where people make, save and find information. Rex's manager handed him a map of that town on day one. Most organisations have never drawn one.
Behind the offices and desks you can see, your organisation has a hidden town: the digital world where its work really happens. Each district is a part of the business, a function or department like Pre-Construction or Operations. Each has its own buildings: the systems where its people create, save and find their information. The town was here before your current project began, and it'll still be here when the project ends. Tap a district on the map to look inside.
Operations
Information management means planning, building and running the town, so the right information reaches the right people at the right time.
Standards such as ISO 19650 are guidebooks for running parts of the town on construction and infrastructure projects. InfoTown shows you the whole town first, so the rules make sense when you see them all together in Lesson 12.
A note for whoever looks after the town (that's IM): make sure you draw out the town before you try to fix it! You can't improve routes nobody can see...
Because towns grow one building at a time, and nobody stops to draw them.
Every new tool adds a building. Nobody updates the map.
New job, new places, same confusion.
And when they leave, it walks out of the door with them.
Drawn once for a bid, then never looked at again.
| Part | What it covers | In the town |
|---|---|---|
| ISO 19650-1 | Concepts and principles: the words and ideas everything else uses | The town and its language |
| ISO 19650-2 | The delivery phase: managing information while a project is designed and built | One project, shared by several firms (most of this Site Induction) |
| ISO 19650-3 | The operational phase: managing information while the asset is in use | Life after handover |
| ISO 19650-4 | Information exchange: how information is checked and passed between parties | Passing work between firms (Lessons 8 and 9) |
| ISO 19650-5 | A security-minded approach to information management | Who is allowed to see what |
| ISO 19650-6 | Health and safety information | Keeping people safe, using information |
In the UK each part is published as BS EN ISO 19650, and Part 2 comes with a UK National Annex (the naming and status codes you'll meet in Lessons 7 to 11).
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 and its UK National Annex are © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.