Stevie and Sam agree where big data lives: a proper store that copes with 400GB, backed up. The CDE holds a record of the scan: what, when, its coordinates, its accuracy and where the data sits.
The point cloud on a hard drive
Before you start
In the story
The scan saw every bolt. Then it lived in a drawer.
The right way
Alex searches the CDE, finds the record, and has access the same afternoon. The 1986 drawing stays in its box.
The connection fits first time. The drawer holds biscuits.
If it's too big for the CDE, it isn't too big to be recorded in the CDE. Where does it live, who can get to it, and is there a second copy?
Story 3: Whose coordinates?
Two firms set out the same pipe from two sets of pins. They meet in the middle, nearly.
The right way, explained
You can't fit a warehouse in the town library. But the library can hold a card saying what's in the warehouse, where it is, and who has the key.
If you're the designer
Ask what survey data the contractor already holds before you reach for old drawings. A scan from last month beats a drawing from 1986.
In the town See it in the town: too big for the shared system. Is it still a parcel?
Stevie's view: a 400GB scan is still a parcel. It needs a label and a known address, even if it lives in the warehouse.
A drawing
- Examples
- IM calls it
- Watch out for
Your own room, then the shared table
Each team works in its own room until its parcel is ready for others to build on. Then it goes on the shared table in the CDE, so the drainage team draws round the beams that actually exist, not the ones from three weeks ago. Clashes get spotted on the table, not on site.
A point cloud is an Information Container too!
Big or small, a scan, a model or a drawing: if it has a name and someone needs it, it's a parcel to be managed.
Sam's Heads Up "Too big" is a storage problem, not an excuse
InfoTown good practice: What the team shares is managed through the CDE.
On your job: Your CDE may choke on scans and models. That's fine. Agree a proper store for them, and keep the record, the status and the link in the CDE.
For the audit What the auditor will ask
- Where is the survey of the existing structure, and who can get to it?
- What happens if that drive or server fails?
For the audit What good evidence looks like
- An agreed place for large data, written into the plan.
- A CDE record for each scan, with its date, coordinates and accuracy.
- A backup, tested at least once.
ISO 19650 Information containers
ISO 19650 counts any named set of information you can retrieve from a file, system or application as an information container, so a point cloud is one. It expects containers to be managed through the CDE, which can be more than one system.
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.