Rex's calculation lists its inputs: where each number came from, and which revision.
Show me your working
Before you start
In the story
The tick said "checked". Nobody had checked what went in.
The right way
Stevie checks the inputs against the latest information first, then the sums, and writes down what he checked it against ("Escalator schedule C03, survey C02") before he signs.
The delivery note matches the calc. The escalators are in before lunch.
Show me your working. A check starts with the inputs: where did each number come from, and is it the latest? A tick with no note of what was checked isn't a check. It's a tick.
Story 6: The readings nobody read
The monitors on the old Precinct spot movement on Tuesday. The people who could act find out eight days later.
The right way, explained
Every road out of the workshop passes a checkpoint. A guard who waves everyone through because the paperwork looks tidy isn't a checkpoint. He's a gate with a hat on.
If you're the designer
When you issue information other people calculate from, like weights, loads or schedules, say what changed between revisions. A bigger number buried in C03 will find somebody's old calc.
In the town See it in the town: the sums were perfect. So why did the lift stop?
Stevie's view: the first checkpoint on the route. It only works if the guard actually opens the parcel.
Not working in the CDE. Your team works in its own system, and the four checkpoints happen there. Approved, the parcel crosses the hoarding into the CDE, and Goods In checks it at the gate: is it labelled right, in the right format, going to the right place? Only then does it reach the shared table. Your project decides which way it works. Either way, the four checkpoints still happen.
Originate
- On the drawing
- IM calls it
- Watch out for
This is the Quality Check!
Someone who didn't make it checks it, including what went in, and writes down what they checked against.
Sam's Heads Up Your checker may be in another firm
InfoTown good practice: Someone who didn't make it checks it.
On your job: Temporary works may need an independent check from another firm. Same rule: they check the inputs too, and the record says what against.
For the audit What the auditor will ask
- Show me how this calculation was checked, and what it was checked against.
- How does a checker know the inputs were the latest?
For the audit What good evidence looks like
- Calculations that list their inputs, with sources and revisions.
- A check record saying what was checked, against what, by whom and when.
ISO 19650 Checking before sharing
ISO 19650 expects information to be checked before it's shared with anyone else. How to check an engineering calculation is your own quality process, not ISO 19650's.
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.