Alex: Can you just sign this off? The client wants it tonight.
To the Checker.
Drawing 042 is finished at five to five on a Friday. The client wants it tonight. The Checker wants to go home.
Rex's diary, before this story. Week 14. Learning to check drawings in my own team. Somebody's just asked me for a signature. It's 4:55 on a Friday.
Signed, not checked
Alex: Can you just sign this off? The client wants it tonight.
To the Checker.
The Checker signs it without opening it. Checked in under a minute. A personal best.
Funmi (design lead): Did anyone review it? … It was checked, wasn't it?
Approved anyway, shared, and on its way to site.
Dave: The drain goes straight through the foundation.
Rex: "But it says CHECKED."
A redesign, a new pipe and a digger standing still for a week.
Three signatures on the drawing. Nobody actually looked.
Three signatures. No checks.
Find out how checking should workLesson 9 · The Checkpoints, then the same story done the right way.