Sam's journey · On the job (delivery) · Story 8

It got out

Drawings showing how The Glasshouse is controlled leave the building. Nobody knows what to do next.

The wrong way

BuildBuild: Friday night…
Friday night

A site engineer wants to work from home, so he emails the control room drawings to his personal account.

BuildBuild: Monday…
Monday

He forwards them to a mate at another firm, for "a second opinion".

BuildBuild: A few weeks later…
Weeks later

The drawings turn up on a hackers' forum. Two hooded figures, grinning at a laptop.

Weeks later

Nobody knows who to tell. The engineer tells his supervisor. The supervisor tells nobody. Nobody tells the client.

In useIn use: Opening day…
Opening day

Every screen in the mall shows the same message, and the speakers read it out on repeat. Thousands of shoppers have a very unusual morning.

The week after

Marcus (client's project manager): When were you going to tell us?

Sam: "When someone told me." The control system is redesigned, every sensitive drawing reissued, and the job runs three months late.

The drawings got out in a day. Nobody said a word. On opening day, someone else was running the building.

Find out what Sam should have done

Sam's Lesson 8 · It got out, then the same story done the right way.