Funmi (design lead): What are we building? Right, that means 40 drawings. Let's plan it.
Turning the client's need into a list. The roof detail can wait.
Plan it! What are we making, and what do we need to get it right first time?
Nobody asked for the drainage layout, so nobody made it until it was urgent. This lesson shows how the client's question becomes a plan.
Same project, starting with the question
Funmi (design lead): What are we building? Right, that means 40 drawings. Let's plan it.
Turning the client's need into a list. The roof detail can wait.
Priya: And we'll need inspections to prove we built it right.
Planning the proof before anyone's dug a single hole. Rex adds it to the list.
Alex opens the design software and starts on 042, the drainage layout. Needed, planned, then made. That's how the drainage drawing is born.
Pick something you're making this week. Who asked for it, what is it for, and when do they actually need it?
Rex's diary. Week 8. Moving to site on Monday. Asked where we keep everything once we're there. Got a shrug.
You already know this one. Your clothes were all over the floor, so you ordered a wardrobe that fits, and it turned up as twelve boxes and a parts list. The shopping centre is the same, just bigger: the client places the order, and the teams turn it into a parts list of everything to make, who makes it and when. If it isn't on the parts list, it doesn't get made, or it gets made in a panic. Alex's roof detail was a lovely extra shelf nobody ordered. Priya's inspections only existed because they were on the list in week one.
Every project starts with the client's question. The design team turns it into a list of drawings to make. The site team turns it into details, questions and inspections. Only then does anybody start making things, inside the right building.
The order and the parts list: the client's needs (the information requirements), turned into a list of every part to make, who makes it, how much detail it needs, by when, and whether it goes to the client.
ISO 19650 calls the client's needs information requirements, from the organisation's big picture down to each individual delivery. The list of what each team will make, and when, is the information delivery plan. Information still being made sits in the work in progress state, inside the team's own space.
A note for the Coordinators (that's IM): start every project with the client's question: what are we building, and what do we need to prove it? Then turn the answers into a list everyone can actually see!
Because making things is the fun part, and planning feels like a delay.
Designing beats writing lists. Every time.
And you assume they'll tell you.
Page 214. Nobody has read page 214.
Until someone asks for it, six months later.
| ISO 19650 says | Means | In the town |
|---|---|---|
| Organisational information requirements (OIR) | What the client's organisation needs to know to run itself | The client's big picture |
| Asset information requirements (AIR) | What they need to know to run the asset | What the drain needs for the next forty years |
| Project information requirements (PIR) | What they need to know to make decisions on this project | "What are we building?" |
| Exchange information requirements (EIR) | Exactly what each appointed party has to deliver, and to what standard | What goes to the client, and when |
| Information delivery milestones | When information has to be delivered | The delivery dates on the order |
| Level of information need | How much detail is enough, and no more | "How much detail does this ingredient need?" |
| Task information delivery plan (TIDP) | Each task team's list of what it will make, and when | Each team's page of the parts list |
| Master information delivery plan (MIDP) | All the TIDPs joined up by the lead appointed party | The whole parts list |
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 and its UK National Annex are © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.