Helen's journey · Lesson 2

Cut it to win it

Before you start

In the story

They cut the people who look after the information. Then paid for it ten times over.

Back to the story

The right way: Priced in, like the scaffolding

Bid review

Helen: What does the client actually ask for?

The tender

It asks for an information plan, a shared place for files, checking and a proper handover. So an information manager and a document controller go in the price, like scaffolding and the site cabins.

Bid submitted

The bid team finds the three per cent somewhere it can explain to the client later.

Cut to winNobody managing information, a fortnight of rework and a payment held.
Priced inAn information manager and a document controller, like the scaffolding.
The right way, explained

The right way, explained

Information management is the town's roads, and document control is its post office. Close them both and the traffic still has to move. It just goes down the back alleys, slower, and someone ends up paying for the crash. Usually you.

If you're the information manager

If you're the information manager

Put your role in the bid with days a week against it, like the scaffolding. If you're "covering" five jobs, tell Helen before the client finds out.

In the town See it in the town: who keeps the routes open, and what happens when they're cut?

Helen's view: cut the Transport Authority and the routes close. The traffic doesn't stop. It finds the back alleys.

The main road between the Design System, the Records Office and the site is barriered off. Parcels travel along a dashed back alley instead. The Transport Authority office has a CLOSED sign.DESIGN SYSTEMRECORDS OFFICETHE SITEROUTE CLOSEDROUTE CLOSEDthe back alley: email, USB sticks, a photo on a phoneTRANSPORT AUTHORITYCLOSED123
  1. 1 The proper routes between buildings, closed. Nobody is planning them, building them or keeping them open.
  2. 2 The traffic doesn't stop. It squeezes down the back alleys, and nothing it carries leaves a trail.
  3. 3 The Transport Authority: the people who plan the routes, build them, open them to traffic and keep an eye on them. Cut to win the bid.

This is the Information Management Function!

The Transport Authority: it plans the routes, builds them, opens them to traffic and keeps an eye on them.

Sam's Heads Up Spread across five jobs is not a role

One information manager "covering" five projects is a rumour, not a role. Somebody has to be on the job day to day, or the shared place turns back into email within a month.

Before the bid goes in, check who is named for information on this job, and how many days a week they're actually on it.

The briefing Four lines for the board
The point

Information management and document control are part of delivering the contract, not overhead to trim.

Why it matters

Cutting the roles doesn't remove the work. It spreads it across engineers paid to do something else, and leaves nobody accountable.

What the standard expects

When a client asks for ISO 19650, the bid has to show who will manage information and that the team can actually do it.

Your decision

Keep the information roles in the price, or accept the risk in writing.

From the standard
For directors What a tender has to show

When a client asks for ISO 19650, the tender response is expected to show more than a price. In plain terms, the bid should show:

The bid showsIn plain words
A plan for managing informationHow we'll run information on this job (the pre-appointment BEP)
That the team can do itPeople, skills and IT, checked for every firm in the team
A plan for day oneHow the shared place, rules and training will be ready before work starts
The risksWhat could go wrong with information, and what we'll do about it

For you: if the information roles aren't in the price, the bid is promising things nobody is paid to deliver.

Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.