Each drawing is checked by someone who didn't make it, against the rulebook, and the check is recorded.
Checked, actually
Before you start
In the story
Forty drawings, forty ticks, four minutes. One very wet plant room.
The right way
It's reviewed against what it's for before it's shared, with a status that says what it's fit for. Every week Sam spot-checks the trail: who checked, when, and how long it took.
The pipe size gets caught at the check. Rex never sees it, and the plant room stays dry.
A tick is a claim. Can you see who checked, what they checked against, and when? Pick five shared items this week and look.
Story 7: The night before
Every firm has checked its own work. Nobody has looked at it all together.
The right way, explained
Every parcel passes the checkpoints before it leaves the building. A stamp without a check is just ink.
If you're the project manager
Ask to see a check record now and then. If your team knows you look, they check.
In the town See it in the town: who checks it, and what does the status really promise?
Sam's view: the checkpoints are on the route, so nothing reaches the shared table without passing them.
Not working in the CDE. Your team works in its own system, and the four checkpoints happen there. Approved, the parcel crosses the hoarding into the CDE, and Goods In checks it at the gate: is it labelled right, in the right format, going to the right place? Only then does it reach the shared table. Your project decides which way it works. Either way, the four checkpoints still happen.
Originate
- On the drawing
- IM calls it
- Watch out for
This is the Quality Check and Review!
Someone who didn't make it checks it, and the status says what it's fit for.
For the audit What the auditor will ask
- Show me the check record for this drawing.
- How do you know the checks are real?
For the audit What good evidence looks like
- Check records with names and dates.
- Statuses used correctly.
- The trail in the CDE.
- Sam's spot-check log.
ISO 19650 Checking and sharing
ISO 19650 expects every piece of information to be quality-checked against the project's standard, then reviewed and approved before it's shared, with a status that says what it can be used for.
| Before sharing | In plain words |
|---|---|
| Quality check | Made to the rules? Named, labelled and formatted properly? |
| Review | Does it do the job it's for? |
| Approve for sharing | Someone who didn't make it says yes |
| Status | Says what it's fit for, and only that |
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.