DesignDesign: Friday, 4.55pm…
Friday
Alex's firm uploads forty drawings to the shared area.
Forty drawings go to the shared area at 4.55 on a Friday. Every one says it's been checked.
The wrong way
Alex's firm uploads forty drawings to the shared area.
Every one is ticked as checked. By the same person. In four minutes.
Rex builds from one. It has the wrong pipe size.
Sam looks at the trail.
Sam: Who checked this?
Alex: "It says checked." Sam: "That's not what I asked."
The plant room becomes a paddling pool.
Forty drawings, forty ticks, four minutes. One very wet plant room.
Find out what Sam should have doneSam's Lesson 6 · Checked, actually, then the same story done the right way.