Rex spots the clash and tells Stevie.
Stevie: Good spot. Now ask it properly.
The answer was right. Nobody else ever saw it.
Rex spots the clash and tells Stevie.
Stevie: Good spot. Now ask it properly.
Rex raises a technical query on the CDE: the photo, the drawing and revision, and the question. Alex answers it there and revises the drawing, and everyone working from it gets the new revision.
The plant room pipework fits. Rex's phone chats go back to being about football.
A question to the designer is information, and so is the answer. Ask where the rest of the job can see it, quote the drawing and its revision, and don't build until the answer is on the record or the drawing.
Rex's crane pad calculation is checked with a tick. The sums are perfect. The numbers going in aren't.
You can shout a question across the street to the planning office and get a nod back. But the nod isn't on the town map, and the next builder only has the map.
Answer queries where they were raised, not in a side channel, and revise the drawing when your answer changes it. A reply on your phone leaves the job when your phone does.
Stevie's view: two routes to the designer. Only the proper one leaves a trail the next builder can follow.
Every project needs a map of its proper routes: who sends what, to whom, and when. Drawings come in on the design line, go out to site on the site line, and up to the client for acceptance. If it's on the map, everyone knows where to look. The back alley never is.
A question to the designer, and the answer, both on the record, and the drawing changed to match.
InfoTown good practice: Questions and answers that change the work go through the CDE.
On your job: Quick chats on a phone will happen, and they're useful. The rule is that anything that changes what gets built ends up on the CDE, as a query and an answer, the same day.
ISO 19650 expects information to be exchanged through the CDE, so there's a record of what was shared, by whom and when. Technical queries are a common way to do that on site; the name and the form are your project's, not the standard's.
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.