Week 1
Rex uses a calc from a folder called OLD STUFF. It's three years out of date.
The same drawing, twice. Once with every shortcut from Rex's year, and once done properly.
Rex's diary, before this story. One year on. A new starter turned up today with nobody to show them round. I drew them the town. Then I remembered my year.
The back-alley town
Rex uses a calc from a folder called OLD STUFF. It's three years out of date.
Forty drawings glued into one file. Good luck finding page 17.
Four files called FINAL. FINAL is a feeling, not a status.
Drawing 042 goes to site in the group chat. The trail fades.
Rubber-stamped at 4:56 on a Friday. Nobody looked.
Built from the van-door copy, then built again. Bloody hell.
That was every shortcut at once.
See how the whole journey joins upLesson 12 · Putting It All Together, then the same story done the right way.