The parts list is written, Sam's built the Site Office, and everyone knows where things go.
Putting It All Together
What does it all add up to?
Before you start
In the story
You've just watched every shortcut at once. This lesson puts the whole journey on one map.
The right way: Drawing 042, the whole journey
The town that works
One parcel, one label, four checkpoints, one proper route.
Dave: Right first time. Again. Teas are on me.
He buys the teas.
If you drew your own town tomorrow, which stop would you fix first?
That's Rex's first year
Back to the Visitor Centre to pick your next route: Sam's job, Helen's year, or the whole project.
The right way, explained
Every lesson is one stop on the same line: from the client's first question, through planning, making, labelling, sharing, checking and handing over, to somebody using it years later. Skip a stop and the shortcut costs you somewhere else. Take them all and nobody notices the system. They just notice things going right.
In the town See it in the town: every stop on one line. What does it all add up to?
Drawing 042's whole journey
One line, twelve stops. Above each stop is the town word; below it is what the standard calls it. Every stop makes the next one possible, and skipping one shows up later, usually on site, usually on a Monday. Pick any stop to go back to that lesson.
This is your ISO 19650 process in action!
Plan it, set it up, make it, label it, share it, check it, hand it over, use it. That's the standard, in town language.
ISO 19650 is the international standard for managing information over the whole life of a built asset. ISO 19650-2 covers delivery: understanding what's needed, appointing the teams, mobilising, producing information together, and delivering it for authorisation and acceptance. The standard sets the process, your BEP is the promise, and your rulebook says how. Together they make the whole town work.
Fix it Where to start on Monday
Where to start
on Monday
- Draw your town: the buildings, the people, the routes and the back alleys.
- Pick the one back alley that hurts most, and build a proper route for it.
- Teach the town language: parcels, labels, checkpoints. The ISO words will follow.
A note for the Coordinators (that's IM): make sure you draw out the town before you try to fix it! You can't improve routes nobody can see...
The whole-town test Three questions for your whole town
Can you see it?
Can you trust it?
Can you find it and prove it later?
The real town Why does any of this matter?
Because every shortcut is cheaper today and dearer later.
Building from the wrong version, then building it again.
If you can't prove what you built, you can't defend it either.
Half an hour hunting, every day, for everyone. Add it up. Then sit down.
Once a client stops trusting your information, they check everything. Slowly.
ISO 19650 The eight activities of ISO 19650-2
| ISO 19650-2 activity | In short | Where you met it |
|---|---|---|
| Assessment and need | The client works out what it needs and sets up the rules and the CDE | Lessons 2 and 4 |
| Invitation to tender | The client says what it needs from bidders | Lesson 4 (the requirements) |
| Tender response | Bidders say how they'll deliver it: BEP, capability, mobilisation plan | Sam's Tender 4 (the promise) |
| Appointment | Who-does-what, the BEP confirmed, and the delivery plans agreed | Lessons 3 and 4 |
| Mobilisation | People, IT and methods set up and tested | Lesson 5 |
| Collaborative production | Information made, checked, reviewed and shared | Lessons 6 to 9 |
| Information model delivery | Authorised by the lead, accepted by the client | Lesson 10 |
| Project close-out | The information is archived and lessons are learned | Follow the Process |
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 and its UK National Annex are © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.