Get readyGet ready: Day one…
Day one
Half the names in the bid are on the next bid. Nobody checks who's actually turned up.
The bid had a mobilisation plan. Now somebody has to actually do it.
The wrong way
Half the names in the bid are on the next bid. Nobody checks who's actually turned up.
Training is an email with a link to a PDF. Nobody opens it.
The naming rules are "tested" on live drawings. The live drawings get the wrong names.
Access: "Give everyone everything, to be safe."
Rex can see the cost reports. So can a fencing firm that left in March.
Sam: Who gave the fencing firm access to the cost reports?
Everyone: "IT."
The plan said train, test and control access. What happened was an email, live testing and "everyone, to be safe".
Find out what Sam should have doneSam's Lesson 4 · Ready before day one, then the same story done the right way.