Production is in full swing. Alex's firm models the plant room in their own template, with their own naming.
Sam's journey · On the job (delivery) · Story 5
Made to the rules
Everyone's drawing and modelling. Everyone's using their own house rules.
The wrong way
DesignDesign: Month two…
Month two
Month two
The steel firm uses its own grid. The M&E firm uses another one.
Month two
Stevie's survey sits on the national grid. The design model sits on a grid Alex's firm made up in 2019.
Coordination
Put them together, and the plant room is 300 metres away, in a field. The cow is unimpressed.
Coordination
Meanwhile, the fence has every bolt modelled. The plant room is a box labelled PLANT.
Coordination
Sam: Did anyone read the plan?
Alex: "We've always done it this way."
The plant room is in a field, and the fence has more detail than the escalators.