Every firm gets the shared kit: templates, title blocks, and one agreed set of coordinates.
Made to the rules
Before you start
In the story
The plant room is in a field, and the fence has more detail than the escalators.
The right way
Everything is named and labelled to the project's standard, not each firm's house style, and made to the level of detail the plan asks for: enough to do its job, and no more.
Stevie's survey and the design line up first time. The plant room is where the plant room should be.
Before anyone models anything, can you hand them the shared kit: the templates, the coordinates and the naming rules? And does everyone know how much detail each thing needs?
Story 6: Checked, actually
Forty drawings go to the shared area at 4.55 on a Friday. Every one says it's been checked.
The right way, explained
Every firm in town builds to the same street plan, with the same house numbers. Bring your own street plan and your house ends up in somebody's field.
If you're the project manager
Ask early whether everyone is working to the same coordinates and templates. It's a five-minute question that saves a re-model.
In the town See it in the town: same kit for everyone, and just enough detail. How much is enough?
Sam's view: every parcel made with the same kit, and only as much detail as the order asked for.
A drawing
- Examples
- IM calls it
- Watch out for
Your own room, then the shared table
Each team works in its own room until its parcel is ready for others to build on. Then it goes on the shared table in the CDE, so the drainage team draws round the beams that actually exist, not the ones from three weeks ago. Clashes get spotted on the table, not on site.
These are Shared Resources and the Level of Information Need!
The same kit for every firm, and just enough detail.
For the audit What the auditor will ask
- Show me the shared resources you gave each team.
- How do you know a model was made to the project's standard?
For the audit What good evidence looks like
- Shared templates and coordinates issued, with a record of who got them.
- Spot checks of naming and labelling.
- The level of detail for each item, set out in the plan.
ISO 19650 Producing to the rules
ISO 19650 expects every team to check it has the shared resources before it starts, then produce information to the project's standard, methods and level of information need, coordinated with the other teams.
| Expect | In plain words |
|---|---|
| Shared resources | Templates, title blocks, coordinates and libraries, issued to everyone |
| The information standard | Naming, labelling and formats, the project's way |
| Level of information need | How much detail each thing needs, and no more |
| Coordination | Teams working from each other's current, shared information |
Based on the ISO 19650 series: the ideas come from the standard; the plain-English wording, examples and advice are InfoTown's. ISO 19650 is © ISO and BSI. You'll hear the same language across the industry. Read more for free in the Information Management Initiative (IMI) Framework guidance from BSI and nima. For the full requirements, use the standard itself.