Can they actually do it?

The back alley's bill so far: 30 weeks · See the bill

The information · Six ticked questionnaires

Every firm in the team says it can look after me. A tick in a box isn't proof.

The wrong way

Win the workWin the work: Tender · week three…
The questionnaire

Every firm in the bid team ticks "Yes, we can manage information". Six firms, six ticks, six very confident ticks.

Good enough

Tom, the bid manager, files the forms without opening them.

Tom: Six ticks. Lovely. Next.

The biggest tick

Nobody asks to see anything. The groundworks firm's tick is the most confident of all. It has gone through the paper.

DesignDesign: Month three of the job…
The laptop

The groundworks firm's drawings arrive. By fax. From a laptop bought in 2009 and a folder called DRAWINGS NEW (2).

Buy a fax machine

Dave, the site manager, has to buy a fax machine to receive them.

Dave: What's a fax?

Retyped

Then someone retypes every drawing by hand. The fax machine gets its own chair, and a name.

Six ticks, no proof, and the first fax machine bought on site this century.

+2 weeks on the back alley's bill: Six ticks and no evidence: a firm that couldn't share drawings, found in month three.