Stage 5 · Build it · Stop 10 of 13

It got out

The back alley's bill so far: 128 weeks · See the bill

The information · Sensitive drawings

I show how The Glasshouse is controlled: its doors, its cameras, its screens and its speakers. Not everyone should be able to see me. Somebody has to decide who can.

The wrong way

BuildBuild: Friday night…
Working from home

A site engineer wants to work from home, so he emails the control room drawings to his personal account. Nobody marked them as sensitive, so nothing stops him.

A second opinion

On Monday he forwards them to a mate at another firm, for "a second opinion".

BuildBuild: A few weeks later…
The forum

The drawings turn up on a hackers' forum. Two hooded figures, grinning at a laptop.

BuildBuild: Meanwhile…
Nobody tells anyone

The engineer tells his supervisor. The supervisor tells nobody. Nobody tells the client.

In useIn use: Opening day…
Pay up

Every screen in the mall shows the same message, and the speakers read it out on repeat. Thousands of shoppers have a very unusual morning.

In use
When?

The client hears it from the shoppers first. Every sensitive drawing is reissued and the controls re-secured.

Marcus (client's project manager): When were you going to tell us?

The drawings got out in a day. Nobody said a word. On opening day, someone else was running the building.

+6 weeks on the back alley's bill: Sensitive drawings with no gate round them: every sensitive drawing reissued and the controls re-secured.